RFQ clarity for loads, flows, interfaces and acceptance evidence. Open RFQ Data Sheet
Project contact

Contact Daifuku with the control boundary

Route the inquiry to an engineering conversation by including the operating profile, load unit, site constraints and current project stage. Corporate address, direct telephone details and local operating hours should be confirmed in the commercial response because those facts are not fixed in the supplied brand assets.

Warehouse control project coordination map and handover board

Address

Confirmed in project correspondence. Request the contracting entity and visitor location appropriate to your country and project.

Email and phone

Use the inquiry form. Business contact details are returned with the assigned region and engineering workstream.

Working hours

Aligned by site time zone. Meeting and response windows are agreed after the project country and operational calendar are known.

Information that speeds technical routing

A useful first note identifies whether the project is a greenfield concept, brownfield extension, controls integration or service review. State the building status, target start window and which teams already own WMS, WCS, WES, PLC, network and safety decisions.

For performance questions, attach the unit or order-line definition, SKU and order distribution, peak duration, buffer rules and exception cases. For storage or conveyor questions, add load dimensions, aisle geometry and fire-route constraints.

What happens after submission

  1. The inquiry is checked for the project region, equipment scope and missing operating inputs.
  2. A commercial or engineering contact confirms the responsible entity and the next review format.
  3. Unverified assumptions are placed in an input register instead of being treated as final facts.
  4. Any response objective, test plan or service coverage is documented for the quoted scope.
Engineering brief

Describe one real operating window

Use exact data where available and labeled ranges where it is not. Avoid sending credentials, health records, payment-card details or other sensitive personal information.

Useful attachments to mention
  • Scaled layout and flow arrows
  • Order or mission sample
  • Load-unit table
  • Interface and controls list
  • Peak and disruption scenarios

Send the project context

Please provide your name.
Please provide a valid email.
Please provide your company.
Please describe the application.
Consent is required to submit.